EPC Geotechnical and Structural
Geotechnical and Structural
AES Cartagena Hydraulic Tunnel Monitoring
Add Time:2018-11-23 View Count:1030 Resoure:EPC

The utility of the instrumentation is to detect any cracking in the second concrete layer of the tube and monitor tunnel deformations during power plant service (when water is flowing through the tunnels).

Aim of Monitoring:
Monitor the two hydraulic tunnels during excavation in an area with important geotechnical problems. The two hydraulic tunnels,part of a hydro power plant in Cartagena (South Spain) are 720 meter long .The utility of the instrumentation is to detect any cracking in the second concrete layer of the tube and monitor tunnel deformations during power plant service (when water is flowing through the tunnels).

INSTALLATION PERIOD TYPE OF SENSORS NUMBER OF SENSORS
2005 – 2006 SOFO 33

Main results:
Measurements with the SOFO system allowed concrete cracking evaluation in the second layer of the tube and guaranteed good execution of the excavation. Long term deformation monitoring of the tunnels guarantees the safety and correct operation of the hydro power plant.