岳把我用嘴含进满足我视频,国产精品av,日产乱码一二三区别免费必看,欧美亚洲自偷自拍 在线

EPC Products Civil Engineering Testing Instruments Geotechnical Testing In-situ Testing Offshore Geotechnical Surveys Offshore Geotechnical Surveys Nearshore CPT system
產品中心
BBS|Hot Topic
Nearshore CPT system

Model:SHARK 200

Use:A new successfully introduced product from Geomil is the SHARK (Submersible Heave-free Aquatic Riser Kit) system. The kit is designed to produce the highest quality marine CPT(U) without having the influence of the marine environment return in your CPT(U)

Standard:GB 50021-2001,JTS133-2013,JTG_C20-2016,TB 10012-2007,ASTM D5778 - 12,ISO 22476-1

  1. The principal of the SHARK system is a long time proven method. Systems are commonly setup on a project basis. This approach handicaps flexibility, brings greater mobilization cost and operational liabilities. Geomil has now designed a compact modular, efficient system to enable a success full nearshore project.
  2. The SHARK is designed for nearshore and inshore CPT projects. Typically water depths from 2 to 30 m can be covered. The SHARK is ideal for CPT works in harbors, waterways and channels.
  3. The SHARK can be operated with fairly straight forward and standard marine plants with great availability around the world. To setup the SHARK, if no sufficient moonpool is available, a cantilever frame which comes with the system is installed over the side of the barge.
  4. The field work with the SHARK needs 2-3 geotechnical operators at each working shift. The SHARK operates relatively simple and good onshore operators will be able to handle the complete operation after some training and support form Geomil.
  5. Transportation of the SHARK can be done with one standard 40’ flatbed trailer. A typical mobilization and setup on a marine barge is done in about 4-6 hours. Because of suitability for road transport, the unit can be swiftly transported between harbors, deltas and inland water masses. Besides road transport might bring the SHARK to locations where other marine plants have difficult access. With modifications the system is suitable for deployment on quay walls in ports.
  6. The system is modular and in its largest setup able to perform 200 kN thrust force. Because of its setup the energy lost on friction is minimal and maximum force will be available to advance the cone. Nevertheless, if full thrust is not required and/or the marine plant does not accommodate the full system weight, the SHARK can be quickly reduced, which makes its handling lighter.
  7. If your professional interest has been awakened and you might see new business opportunities for your company, please do not hesitate to contact Geomil and speak to our marine specialist to see if this system can be beneficial to your operation. We will be glad to support your new ideas.
Project Case
Solution
Download
相關標簽
主站蜘蛛池模板: 于田县| 南木林县| 罗甸县| 客服| 金溪县| 大英县| 博客| 迁安市| 哈尔滨市| 延吉市| 滨州市| 荥经县| 晴隆县| 安宁市| 汝南县| 石首市| 高密市| 莒南县| 平邑县| 临漳县| 曲沃县| 镇宁| 广西| 凤翔县| 喜德县| 大埔县| 嘉兴市| 崇文区| 洪江市| 旌德县| 新乐市| 屯昌县| 龙口市| 河北省| 祁阳县| 山东| 惠水县| 庄河市| 黄龙县| 康平县| 新宁县|